Skip to content
Overall Conditions - 4th Floor Trusses-1

TRU by Hilton Hotel Update

The TRU by Hilton Hotel in Lake Delton is going up at a fast pace. This 100-room hotel is primarily constructed out of wood studs and wood panels. Currently, the third floor is being framed and sheathed with MEP rough-ins after each floor is covered. After the fourth floor is completely framed and sheathed, the roof trusses, parapet framing, and sheathing will be installed followed by the windows, masonry veneer, roofing, and EIFS siding. Projected to finish up in early summer 2023, this hotel will be ready for prime vacation season.