Skip to content

FOOD & DAIRY PORTFOLIO

Klondike Cheese Company
storage Warehouse

Monroe, WI

Overview

ARCHITECT

Jewell Associates Engineers, Inc.

Square Footage

100,275

KLONDIKE CHEESE COMPANY

Storage Warehouse

Bursting at the seams, Klondike Cheese Company sought solutions to expand storage capacity for both dry and finished goods. After evaluating multiple locations, the company chose to construct a large climate-controlled warehouse across the road from its production plant. The new facility supports cold and dry storage and was strategically designed for future build-outs. The aggressive 10-month schedule began with controlled rock blasting and excavation, removing an estimated 110,000 cubic yards of bedrock. Kraemer Brothers’ AISC-certified ironworkers erected the structural steel and joists throughout the facility, while concrete crews poured the floors, and award-winning carpenters completed the interior finishes. A new 200,000-gallon above-ground water tank and pump house were also constructed on site to serve both this warehouse and the existing production plant. As a leading food and dairy construction firm in Wisconsin, Kraemer Brothers continues its long-standing partnership with Klondike Cheese Company.

Ryan Kraemer

President

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.